Gaps

Discussion in 'Repairs & Maintenance' started by Steve Rehn, 23rd Jan, 2017.

Join Australia's most dynamic and respected property investment community
  1. Steve Rehn

    Steve Rehn New Member

    Joined:
    18th Aug, 2015
    Posts:
    1
    Location:
    Adelaide
    Hi All

    Our IP gaps of about 3 inches between footing and concrete path around house, any ideas on how to fill them.

    Thanks
     
  2. Propertunity

    Propertunity Well-Known Member

    Joined:
    19th Jun, 2015
    Posts:
    3,476
    Location:
    NSW
    One of mine had the same. A couple of bags of sand from Bunnings fixed it.
     
  3. DaveM

    DaveM Well-Known Member

    Joined:
    14th Jun, 2015
    Posts:
    3,761
    Location:
    Adelaide & Sydney
    Gravel is quick easy and no mess, and also easy access to inspect for termites and damp
     
    Propertunity likes this.
  4. WestOz

    WestOz Well-Known Member

    Joined:
    19th Jun, 2015
    Posts:
    1,259
    Location:
    WestOz
    Taking a stab, "possibly" the gap is intentional.
    One consideration would be for easy termite control/treatment, rather than drilling holes through the path every foot or so for treatment.
     
  5. willair

    willair Well-Known Member Premium Member

    Joined:
    19th Jun, 2015
    Posts:
    6,795
    Location:
    ....UKI nth nsw ....
    Just buy a few bags of premix,just pour the mix in broom the surface off then just a light spray of water and let it set,but the easy way is just use gravel that would be the low cost and easy to do..imho..