PPOR Project

Discussion in 'Renovation & Home Improvement' started by Tim86, 5th Oct, 2015.

Join Australia's most dynamic and respected property investment community
  1. Tom Rivera

    Tom Rivera Property Manager Business Member

    Joined:
    1st Jul, 2015
    Posts:
    2,718
    Location:
    South East Queensland
    Not building a garage to store the toys!?
     
    Tim86 likes this.
  2. hobo

    hobo Well-Known Member

    Joined:
    18th Jun, 2015
    Posts:
    682
    Location:
    FNQ
    Carport on the left? That could help. :)
     
  3. Tim86

    Tim86 Well-Known Member

    Joined:
    18th Jun, 2015
    Posts:
    1,818
    Location:
    Brisbane
    Nah down the right side where the driveway is.

    So you're saying there should be something to break up the left front wall?

    Lol thats very low on the list of priorities.
     
  4. Kesse

    Kesse Well-Known Member

    Joined:
    14th Jun, 2015
    Posts:
    891
    Location:
    Cairns
    Yeah, I'm with Hobo on this one. To the left of your front door there needs to be something - a big arse window, or better, a veranda. It looks a bit unbalanced and NQR at the moment. A bit top heavy.
     
  5. Tim86

    Tim86 Well-Known Member

    Joined:
    18th Jun, 2015
    Posts:
    1,818
    Location:
    Brisbane
    There's a few things you both aren't taking into consideration.

    Have a lil faith :D
     
    hobo likes this.
  6. Tim86

    Tim86 Well-Known Member

    Joined:
    18th Jun, 2015
    Posts:
    1,818
    Location:
    Brisbane
    Been working on the steel frame for the screening timber on the side section. 20180829_174329.jpg 20180829_174211.jpg
     
    EN710 likes this.
  7. Tim86

    Tim86 Well-Known Member

    Joined:
    18th Jun, 2015
    Posts:
    1,818
    Location:
    Brisbane
  8. Tim86

    Tim86 Well-Known Member

    Joined:
    18th Jun, 2015
    Posts:
    1,818
    Location:
    Brisbane
  9. Tim86

    Tim86 Well-Known Member

    Joined:
    18th Jun, 2015
    Posts:
    1,818
    Location:
    Brisbane
    Screenshot_20180915-113023_Gallery.jpg

    Screening timber been going up on the left side. So now the top is all safe with all the handrails and posts fixed and all the gaps sorted.
     
    samiam, WattleIdo and EN710 like this.
  10. Tim86

    Tim86 Well-Known Member

    Joined:
    18th Jun, 2015
    Posts:
    1,818
    Location:
    Brisbane
    20180928_235020.jpg 20180928_235010.jpg

    Some bits to finish off to make it look right. But the hard bits are done.
     
    Brady, samiam and WattleIdo like this.
  11. WattleIdo

    WattleIdo midas touch

    Joined:
    18th Jun, 2015
    Posts:
    3,429
    Location:
    Riverina NSW
    I see you have a nice Cambridge tile there.
     
    Last edited: 30th Sep, 2018
    Tim86 likes this.
  12. Tim86

    Tim86 Well-Known Member

    Joined:
    18th Jun, 2015
    Posts:
    1,818
    Location:
    Brisbane
  13. Tim86

    Tim86 Well-Known Member

    Joined:
    18th Jun, 2015
    Posts:
    1,818
    Location:
    Brisbane
    Think about $6000 to do the bathroom.
     
    EN710 likes this.
  14. Tim86

    Tim86 Well-Known Member

    Joined:
    18th Jun, 2015
    Posts:
    1,818
    Location:
    Brisbane
    174m of 100mm pipe to run the gutters to the kerb. Its like doing the storm water for a unit block... 20181011_171419.jpg
     
    EN710 likes this.
  15. Tom Rivera

    Tom Rivera Property Manager Business Member

    Joined:
    1st Jul, 2015
    Posts:
    2,718
    Location:
    South East Queensland
    That's because your house is as big as a Unit block! :p
     
    bob shovel and Tim86 like this.
  16. Tim86

    Tim86 Well-Known Member

    Joined:
    18th Jun, 2015
    Posts:
    1,818
    Location:
    Brisbane
    ... yeah there is that...
     
  17. Tim86

    Tim86 Well-Known Member

    Joined:
    18th Jun, 2015
    Posts:
    1,818
    Location:
    Brisbane
    20181017_094846.jpg

    Just been doing the handrails out back and finishing off downstairs. Trying to tick off all the boxes for the house to get certified by my 20th december deadline.
     
    Sackie likes this.
  18. Tim86

    Tim86 Well-Known Member

    Joined:
    18th Jun, 2015
    Posts:
    1,818
    Location:
    Brisbane
    Had a couple things that needed connecting up in the gap between floors. Lucky Im skinny. Even so Im covered in red marks from dragging myself through for about 30m all up. Fun times. 20181018_125842.jpg
     
  19. Tim86

    Tim86 Well-Known Member

    Joined:
    18th Jun, 2015
    Posts:
    1,818
    Location:
    Brisbane
    Handrail all done now. Except for the steps.

    Screening done on side of house also.

    Got the plasterers coming tomorrow for downstairs. They are giving me a good price so Im just getting them to sheet and plaster and sand. Outsourcing jobs feels weird after all the diy. But wife is 36wks pregnant now so getting things finished soon is important. 20181025_103345.jpg 20181025_103438.jpg 20181025_163806.jpg
     
    EN710, wylie and Brady like this.
  20. Tim86

    Tim86 Well-Known Member

    Joined:
    18th Jun, 2015
    Posts:
    1,818
    Location:
    Brisbane
    Backyard is looking so nice after all the rain. 20181026_103107.jpg
     
    EN710 likes this.