    Hi all,

    I am planning on doing a 3 lot build/subdivision at the end of the year so just trying to get my knowledge up to minimise losing my shirt.

    Below is a work in progress checklist on choosing a site suitable for development. It is for initial feasibility only, something I can take to property inspections and fill in before/after when doing research about the property. I am based in Melbourne.

    Would love to hear from anyone/everyone on what extra things should be considered.


    Title

    Torrens or General Law

    Are title dimensions based on Survey

    Confirm dimensions/area compared to RE agents published dimensions/area

    Confirm occupation distances match title dimensions, or do survey within cooling off period if can

    Covenants

    Easements

    Other restrictions?


    Legal / Conveyancing

    What should I be looking out for/checking prior to purchase?

    Caveats?



    Planning

    Zone

    Overlays

    Public Open Space contribution -5% or Clause 52.01

    Developer/infrastructure Contributions?? Anyone know where to find any other contributions that might be applicable?

    Flooding - not always in overlay - check with Melb water?/council

    Other developments in street

    Strategic Planning

    - Change of use/zoning/overlays - where to go to see if any proposed planning changes in pipeline?

    - Local planning on Development - Clause 20's

    - Township plans

    - Councils general comments on development (phone conversation to strategic/statutory depts)



    Property

    Trees on property - significant/remnant

    Street Trees/services in way of proposed crossover – what are council’s views towards replacing street trees in another position?

    Possible points of discharge

    Grade of block and direction

    Services - sewer/water/drainage/gas/telstra/NBN/electricity

    - Telstra/Fibre - Clause 66.01-1 - causing long delays in getting subdivision compliance documentation - better if pit out front of property

    - Electricity Pit - Suppliers do not like overhead supply. If in an area that has overhead supply, and a new pit may help abutting property, then supplier may install pit for free, also if in a fire danger area. Otherwise up for cost of new pit 3k+ - have people found this to be correct? anyone know anymore about this?

    - Sewer/drainage - check connection downhill from proposed dwellings, what if not? Pump costs/design to enable uphill connection?


    Abutting Property’s

    Trees near boundary - significant/remnant – what is the general rule about building close to boundary that has a tree on abutting property? Can’t build within foliage spread area?

    Neighbours dwelling position

    Neighbours SPOS position and size

    - overlooking (clause 55.04-6) 9m rule

    - overshadowing (clause 55.04-5) 75% rule for 5 hours - does this mean need to look out for small SPOS area of abutting property near our boundary if proposing to build along this boundary?

    Neighbouring habitable window positions, proposed dwellings must

    - ensure daylight (clause 55.04-3)

    - are neighbours habitable windows north facing? - extra setbacks (clause 55.04-4)

    Building Setbacks of neighbour

    - Front (clause 55.03-1)

    - Side (clause 55.04)



    All of Clause 55 seems good to know, but for the purposes of initial feasibility I think maybe only the clauses listed above? What do you guys think?
     
    Last edited: 4th Feb, 2017
  2. johnmelbourne

    johnmelbourne New Member

    Joined:
    31st Jul, 2017
    Posts:
    2
    Location:
    Melbourne
    note this
     
    lixas4 likes this.
  3. Westminster

    Westminster Tigress at Tiger Developments Business Member

    Joined:
    3rd Jun, 2015
    Posts:
    11,357
    Location:
    Perth
    That's a great list @lixas4 - I didn't see it until now (duh)

    It's a little Melbourne centric but has valid points that can be translated to all states
     
    lixas4 likes this.
  4. Big Lez

    Big Lez Well-Known Member

    Joined:
    8th Mar, 2017
    Posts:
    75
    Location:
    Sydney
    Pretty good list.

    If a serious amount of earthworks is involved, I would add geotechnical information by looking up geotechnical maps of your area. Also look at how deep the the water table is too.

    I was doing some work for a developer and they thought they had a pretty good deal, but the earthworks bill was absolutely astronomical because of all the piling required as well as the fact that the basement was below water table. I believe they only just broke even on that development.
     
    lixas4 likes this.
  5. Hamish Blair

    Hamish Blair Well-Known Member

    Joined:
    29th Sep, 2015
    Posts:
    489
    Location:
    Melbourne
    GST margin scheme
    Income tax (CGT discount unlikely)
    Valuation might have a discount in one line prior to subdivision. Could be 20% of gross realisable value.
     
    Pumpkin and lixas4 like this.
  6. Mustafa Salehi

    Mustafa Salehi Well-Known Member

    Joined:
    17th Nov, 2015
    Posts:
    71
    Location:
    Melbourne
    It's a good list but even before these steps you need to ensure the project stacks up financially otherwise bank funding will get difficult. You can do a high level financial feasibility by doing market research on comparable developments then evaluating if there is enough profit in it for you to take the above steps.
     
  7. Scott No Mates

    Scott No Mates Well-Known Member

    Joined:
    18th Jun, 2015
    Posts:
    27,248
    Location:
    Sydney or NSW or Australia
    I'd also add:

    • ASRIS acid sulphate soil
    • Soil testing
    • Soil saturation/permeability
    • Requirements for tree protection both on the lot and adjoining the lot
    • Temporary site access requirements
    • Siltation controls
     
    lixas4 and Mustafa Salehi like this.
  8. Mustafa Salehi

    Mustafa Salehi Well-Known Member

    Joined:
    17th Nov, 2015
    Posts:
    71
    Location:
    Melbourne
    It pays to hire a good team including town planner, surveyor, geotechnical engineer, accountant, mortgage broker to assess your project prior to purchase. Most of the above will be covered by them and they will most likely find problems that you might not be able to foresee yourself.
     
    lixas4 likes this.
  9. LukeR

    LukeR Well-Known Member

    Joined:
    17th May, 2016
    Posts:
    98
    Location:
    Melbourne
    Scott

    Assuming you are from NSW and that is why you are aware of this issue? Or have you had it occur in melbourne?

    Would you pay for a test prior to submitting an offer? (not sure what consultant you would call this?
     
  10. Scott No Mates

    Scott No Mates Well-Known Member

    Joined:
    18th Jun, 2015
    Posts:
    27,248
    Location:
    Sydney or NSW or Australia
    @LukeR - just part of the back catalogue.

    A geotech should be able to assist.