Hi Tim, Mortgagee Consent is required for your Title Registration application after you have your sealed plan from BCC. Thanks Matt
PM Sent.
I believe you are generally correct in your assumptions around minimum setbacks under the small lot code being 1m and the existing pre war house...
Hi Medusa, Starting point would be to understand the zoning and any constraints over the site. This would be factored into a Highest and Best use...
Hi BrisbaneInvestor, It is possible to bridge over the sewer infrastructure via a Build Over Sewer application, however it will require review by...
Hi Sheshop, it depends on the profile of the buyer, they will all use different metrics to assess the site.
Hi Mark, I’d be happy to assist and sounds like your feaso might need a review. Cheers Matt
Which State are you in?
Hi Skip, We’ve just completed a very similar development with the same issue. Happy to have a look at this for you if you’d like to advise the...
Hi Tim, Design Plumbing and Gas (Owner Operator - Plumber Brisbane - Plumber Gold Coast - Design Plumbing and Gas Pty Ltd) are doing a couple of...
Our experience recently is that BCC is sticking very closely to the Code. I am sure there are examples out there where they have strayed, however...
Hi Andrew, If you would like to DM the address I may be able to assist or can put you in touch with the relevant consultants. Regards Matt
Hi Newatthis, Happy to help. If you'd like to PM me your address we can take a look at this for you and provide some thoughts. Cheers Matt
Non Trunk also relates to any ability to claim an Infrastructure Charges offset. The cost of Trunk Infrastructure can generally be offset against...
TomC, Depending on the location, aspect and dimensions of the block, it would be relatively easy to come up with a bracket value of the site as...
Hi Story, Depending on the particulars of the site, location, slope, services etc the cost proposed sound quite high for a 1 into 4 subdivision....
What was the area shown as in your contract (Disclosure Plan/Survey Plan)? Do you have a marketing plan which depicts the proposed bushland?
Hi Anne, the builder has control of the site as Principal Contractor after possession and accordingly they are responsible for the Workplace...
Hi Anne, this would be largely dependent on the scope of works quoted for. If works were to occur outside the agreed scope of works then...
Another option may be to speak with some of the trades/sub contractors and suppliers to make sure they've been paid as required as you don't want...